Discharge Port Design and Application of the North Sea Tieshan Port 1 #, 2 # Berth Rear Reclamation Engineering
Type:
Presented during:
WODCON XIX: "Dredging makes the World a better place" - 2010, Beijing, China
Authors:
LiuYang
Abstract: Cutter suction dredger construction and the loss of hydraulic fill volume control is a key link in hydraulic fill projects. The loss of volume reduction for every 1% of the net profit left over for the works, according to the "North Sea Tieshan Port 1 #, 2 # berth rear hydraulic fill project "summed up the experience in construction, mainly in two directions. One is to develop a reasonable program of hydraulic fill pipeline laying that will be easy to drain silt type of soil, depending on the silt soil type make every effort to squeeze into the distance the vent outlet remote location. The second is to set the effective loss of water sluicing mouth and the concentration of Device Controls to ensure that dredged soil does not drain after the hydraulic fill up.
Keywords: Dredging and filling Discharge port Concentration Soil losses