Confined Aquatic Disposal Cell Capping Design, Construction and Monitoring: The Case of Piaçaguera Channel – Santos – SP – Brazil World Dredging Congresses € 20,-
Applying Automatic Identification System Data to Determine Dredging Production Rates and Resulting Sediment Plume Compliance – a Port Everglades Case Study World Dredging Congresses € 20,-
Integrating Engineering with Ecology and Natural Resource Economics to Emphasize Coastal and Habitat Resilience World Dredging Congresses € 20,-
Use of Rock Revetments to Protect Industrial Facilities – Three Case Studies World Dredging Congresses € 20,-
Identification of Unexploded Ordnance and Buried Objects by Use of a Marine Emi Sensor at the Fehmarn Belt Tunnel Project World Dredging Congresses € 20,-
How to Manage Light Emissions to Avoid Migratory Songbird Collisions at an Offshore Construction Site World Dredging Congresses € 20,-